Project Update May 15th, 2012

Home

Open House #2 - April 25, 2012 Lake Hood Elementary


Thank you to everyone that attended Open House #2 on April 25 and provided us with feedback on the Draft Alternatives.  

The Open House Comments Summary is now available for review:

Open House #2 - Comments Summary

We are continuing to take comments and feedback on the Draft Alternatives during this Preliminary Design Study Phase of the project.  

E-mail us at comments@crweng.com or go to the Contacts tab at the top of the page to submit comments directly through this website. Or you can call us at 562-3252.

To review the Draft Alternatives presented at the Open House click on the links below:

Next Steps: 

Fall 2012 - Preliminary Design Study Phase continues

A Draft Design Study Report (DSR) will be submitted to the Planning and Zoning Commission and will be posted to this website for public review. The Draft Design Study Report (DSR) provides the summary of the alternatives development and the detailed analysis for the selection of a preferred alternative to be carried forward to the next phase of the project, the Design Phase. For an overview of the Design Process and Schedule please see Project Overview.

Project Background

Turnagain Street and Turnagain Boulevard do not meet current Municipal roadway standards. This project will evaluate alternatives to upgrade the roadways to current Municipal standards to improve both pedestrian and driver safety. Improvements are expected to include a new road base, pavement, drainage system,  pedestrian/bicycle facilities, and lighting. Both roadways are respectively, the numbers 1 and 2 priorities for the Turnagain Community Council.

Documents

Documents can be found under Project Overview, Documents in the sidebar on the right.